Professional Protection for Your LUMINOR UV System
The quartz sleeve is a critical, yet often overlooked, component of your water treatment system. Its job is to protect the UV lamp from water contact while allowing the germicidal light to penetrate effectively. The LUMINOR RQ-420 is designed specifically for the 08X, 15X, and LB5-Z series reactors to maintain the hydraulic and structural integrity of your system.
Why Quality Quartz Matters
Not all glass is created equal. Using a genuine LUMINOR sleeve ensures your system operates at peak efficiency:
- GE214 Material: This high-purity quartz is resistant to clouding, meaning your water gets the maximum UV dose for the entire life of the sleeve.
- Stress-Free Maintenance: Our fire-polished ends mean the sleeve can be handled and tightened into the reactor without the typical stress-cracking found in lower-quality aftermarket glass.
- Perfect Fit: Specifically designed for the 18.3″ chamber requirements of LUMINOR rack systems and individual units.
Technical Specifications
| Feature | Details |
|---|---|
| Model Number | RQ-420 |
| Compatible Systems | LB4/5/6-08X, LBH4/5/6-15X, & All LB5-Z/LBH5-Z Racks |
| Compatible Lamps | RL-420, RL-420HO (Sold Separately) |
| Total Length | 18.3″ (465mm) |
| Material | GE214 Pure Quartz |
| End Style | Open-Ended, Fire Polished |
How to Clean/Replace Your RQ-420 Sleeve (Video Tutorial Below)
Step 1. If a by-pass assembly is installed, shut the inlet valve off to prevent water flow through the system. Otherwise, turn off main water inlet valve (and/or turn off the water pump)
Step 2. Unplug the power for the controller.
Step 3. Release water pressure by opening a downstream faucet and then close the outlet shut-off valve (if any).
Step 4. Unscrew the captive ground screw from the ground lug on the UV reactor.
Step 5. Push down lamp cable and turn 1/4 turn counterclockwise to release lamp cable from gland nut.
Step 6. Being careful to touch only the ceramic ends, disconnect and remove the lamp from the reactor.
Step 7. Unscrew the gland nut from the reactor exposing the end of the quartz sleeve.
Step 8. Remove the quartz sleeve and O-ring by gently twisting and pulling the quartz sleeve. The spring should remain inside the quartz sleeve.
Step 9. Using a soft, lint free cloth or towel wipe the sleeve down using a commercial scale cleaner (i.e. CLR or LIME-A-WAY). This removes scaling or iron deposits that may be on the outside of the quartz sleeve. Be careful not to get any moisture or liquids inside of the sleeve.
Step 10. Dry the sleeve with a separate cloth.
Step 11. Replace the O-ring and slide the sleeve back into the reactor, reversing the previous steps.







Reviews
There are no reviews yet.